ETi Toyota Supra MK4 JZA80 Type 80 Carbon GT Wing

Product Description
ETi Toyota Supra MK4 JZA80 Type 80 Carbon GT Wing
The carbon GT wing from the ETi Type 80 widebody, now sold on its own. A big, wide blade with an integrated LED light, designed for the Type 80 rear and able to mount on a stock MK4 Supra trunk.
Key Features
- Integrated LED light that wires in directly as a brake light
- Mounts on the Type 80 rear or a stock JZA80 trunk lid
- It is a big wing. On a stock-body car it reads large, by design.
- Fitment: Toyota Supra MK4 (JZA80), 1993-2002
- Matte Carbon or Gloss Carbon twill, finished in a UV-protected clear
- Production time: 6-8 weeks, made to order
- Installation: professional installation recommended. Drilling the trunk lid may be required if your car did not previously run this wing.
Shown on a Type 80 widebody build. See the full kit on the Type 80 page.
Parts Included in Spec
Key Aerodynamic Features
Composite Structures
Lead Time & Shipment
Most Elite Ti components are built to order to ensure weave consistency and quality. Estimated production timeline is 3–5 weeks depending on your selected configuration, chassis spec, and weave finish.
ETi Toyota Supra MK4 JZA80 Type 80 Carbon GT Wing
The carbon GT wing from the ETi Type 80 widebody, now sold on its own. A big, wide blade with an integrated LED light, designed for the Type 80 rear and able to mount on a stock MK4 Supra trunk.
Key Features
- Integrated LED light that wires in directly as a brake light
- Mounts on the Type 80 rear or a stock JZA80 trunk lid
- It is a big wing. On a stock-body car it reads large, by design.
- Fitment: Toyota Supra MK4 (JZA80), 1993-2002
- Matte Carbon or Gloss Carbon twill, finished in a UV-protected clear
- Production time: 6-8 weeks, made to order
- Installation: professional installation recommended. Drilling the trunk lid may be required if your car did not previously run this wing.
Shown on a Type 80 widebody build. See the full kit on the Type 80 page.
Parts Included in Spec
Key Aerodynamic Features
Composite Structures
Lead Time & Shipment
Most Elite Ti components are built to order to ensure weave consistency and quality. Estimated production timeline is 3–5 weeks depending on your selected configuration, chassis spec, and weave finish.
