ETi Toyota Supra MK4 JZA80 Race Dash RHD (In Stock, Gloss Carbon)

Product Description
ETi Toyota Supra MK4 JZA80 Race Dash RHD (In Stock, Gloss Carbon)
Product Description
The ETi race dash for the right-hand-drive Toyota Supra MK4 JZA80 in gloss carbon, finished and ready to ship. The same dash as our made-to-order listing, without the build wait.
Key Features
- Right-hand drive only. Built for RHD cars.
- Replaces the factory dash with a lightweight carbon race dash.
- Ships now from Bangkok stock.
Material
Gloss carbon, clear-coated.
In Stock, Ships Now
This unit is finished and on the shelf at our Bangkok shop. No 6-8 week build wait: it is packed and booked as soon as your order clears.
Shelf stock is limited to the quantity shown. Want a different finish? The made-to-order version is built in 6-8 weeks.
Installation: Professional installation recommended.
Parts Included in Spec
Key Aerodynamic Features
Composite Structures
Lead Time & Shipment
Most Elite Ti components are built to order to ensure weave consistency and quality. Estimated production timeline is 3–5 weeks depending on your selected configuration, chassis spec, and weave finish.
ETi Toyota Supra MK4 JZA80 Race Dash RHD (In Stock, Gloss Carbon)
Product Description
The ETi race dash for the right-hand-drive Toyota Supra MK4 JZA80 in gloss carbon, finished and ready to ship. The same dash as our made-to-order listing, without the build wait.
Key Features
- Right-hand drive only. Built for RHD cars.
- Replaces the factory dash with a lightweight carbon race dash.
- Ships now from Bangkok stock.
Material
Gloss carbon, clear-coated.
In Stock, Ships Now
This unit is finished and on the shelf at our Bangkok shop. No 6-8 week build wait: it is packed and booked as soon as your order clears.
Shelf stock is limited to the quantity shown. Want a different finish? The made-to-order version is built in 6-8 weeks.
Installation: Professional installation recommended.
Parts Included in Spec
Key Aerodynamic Features
Composite Structures
Lead Time & Shipment
Most Elite Ti components are built to order to ensure weave consistency and quality. Estimated production timeline is 3–5 weeks depending on your selected configuration, chassis spec, and weave finish.
